The initial layout of the proposed sanitary landfill was prepared by the consultant in cooperation with gtz-AHT STE Eng. F. Boemer, and with contributions from the members of the Technical Working Group of the Solid Waste Management Board of Passi City and the Environmental Management Bureau (EMB) of DENR, Region 6. On May 10-12, 2006 a workshop was conducted at HydroNet Consultants Office in Cebu City to discuss the various physical layout options. The consultant and the technical experts of GTZ-AHT, Engineers F. Boemer and M. Meimberg further refined the design layout.
The planning and designing of the landfill are based on the following general assumptions.
Based on these assumptions, alternative layouts and schemes were developed and explored. The preliminary layouts were examined with respect to basic design considerations such as capacity, stability, technical feasibility, and cost.
With due consideration of the actual topography and operational requirements of the sanitary landfill, schematic layouts of the landfill facility showing landfill cell, MRF and composting area, administration building, and other utilities and structures are shown in the figure below.
A complete set of maps and plans including landfill layout and cross sections have been prepared. These plans provide details of the original topography of the area, elevations and cross sections of the proposed landfill cells, drainage and leachate collection system, gas venting system, and the lay out of the completed landfill. The figure below shows the option being considered for the landfill lay-out. Analyses of the various factors and consideration of the different assumptions and criteria lead to the choice of an option that is most favorable for the implementation of the project.
Due to unfavorable terrain, only 1.5 hectares shall be developed; although, the total area of the proposed landfill site is approximately 6.5 hectares. A larger part of the area falls within a slope range of more than 30 degrees, considerably limiting design options. The landfill has a total capacity of 150,000 cubic meters translating into a estimated lifespan of 15 years. Below is a breakdown of landfill area per cell and the estimated cut and fill.
| Landfill Cell | Area (sqm) | Height (m) | Capacity (cum) |
| Cell 1 | 4,620 | 8.4 | 38,800 |
| Cell 2 | 5,864 | 11.7 | 68,608 |
| Cell 3 | 4,800 | 9.1 | 43,680 |
| Total | 15,284 | 151,088 |